
Rum Row
Rum Row Drainage Improvements
PDPOA will improve the stormwater drainage system along Rum Row to enhance drainage performance and address existing infrastructure needs. The project will include upgrades to drainage infrastructure and the restoration of affected roadway areas, helping improve the long-term reliability and resilience of the community’s stormwater system.
Read More

Mooring Buoy 3
Mooring Buoy 3 – Mooring Buoy Drainage Improvements
PDPOA will upgrade stormwater drainage infrastructure from Port Tack to the end of Mooring Buoy to improve drainage performance and the long-term reliability of the system. The work will include replacing and improving existing drainage infrastructure and upgrading culverts to improve lagoon circulation.
Read More

Mooring Buoy 2.1
Mooring Buoy 2.1 – Mooring Buoy Drainage Improvements
PDPOA will improve stormwater and bulkhead infrastructure from Sea Lane to Port Tack to address existing drainage needs and strengthen the system’s long-term performance. The project will include drainage improvements, along with associated bulkhead and shoreline work.
Read More
