PROJECT LOCATION /SCOPE

Rum Row

 

The proposed project consists of roadway and drainage improvements along approximately 0.32 miles of Rum Row. Stormwater infrastructure improvements are expected to include installation and/or replacement of storm drainage pipe and structures, utility adjustments or conflict box installation where required, improvements to the proposed outfall and associated grading, and other drainage improvements shown on the Construction Plans.